Waste Water Treatment Tanks Demolition & Install

Share

Western Australia Civil Construction

Client

Location

Sector

Completed

Jun 2023

Value

$1 million

Removal of legacy wastewater infrastructure and installation of new, high-efficiency treatment tanks in the Pilbara.

KW Civil was contracted to demolish outdated treatment tanks and replace them with modern, high-performance systems. Scope included tanks demolition, installation of new tanks and piping, and associated structural reinforcement.

Subsurface scanning revealed previously undocumented underground services and buried obstructions. These were managed through a revised demolition plan and sequencing adjustments, minimising disruption and protecting nearby assets. Coordination with stakeholders ensured continued operational safety and alignment with compliance requirements.

All works were completed to environmental and regulatory standards. Challenges were resolved efficiently, with sustainable materials and methods used throughout to support long-term performance and environmental accountability.