Capability Statement

KW Civil & Construction Pty Ltd
ABN: 43 646 229 763

Meet the Directors

Konrad Williams
Founder and Managing Director
Starting as a labourer, Konrad built KWCC over 15 years into a respected contractor. He’s known for assembling high-performing teams and maintaining a grounded, client-focused leadership style.

Jeff Burke
Director
With over 35 years of experience, Jeff has delivered major projects for Rio Tinto across mine infrastructure, communications, and camp construction. His long-term industry relationships enhance KWCC’s project delivery.

Safety Commitment

KWCC is implementing Rio Tinto’s Safety Maturity Model (SMM) to strengthen our already ISO-certified systems (ISO 9001, 45001, 14001). This framework helps us:

Embed a culture of safe, independent operations

Continually assess and improve risk management, planning, and incident learning

Empower staff at all levels to take ownership of safety outcomes

Core Services

Earthworks & Construction

  • Bulk & detailed excavation

  • Trenching, fibre & underground services

  • Formwork, concrete, culverts, drainage

  • Contaminated waste removal

  • Non-destructive digging

Building & Construction

  • Project management

  • Civil signage, fencing, site clean-up

  • Structural & light steel fabrication

  • Commercial buildings & refurbishments

  • Electrical, plumbing, cyclone tie-downs

Equipment Wet Hire

  • Excavators, graders, rollers

  • Watercarts, service trucks

  • Skid loaders, solar lighting towers

Project Experience

Minesite Dust Mitigation – Cape Lambert (Rio Tinto) – $3.7M
New roads and carparks to eliminate operational dust. Delivered on-time and on-budget with zero incidents.

Borrow Pit Management – Karratha (Bechtel) – $8M
Clearing, excavation, haulage, and full rehabilitation. Adjusted to weather delays and environmental sensitivities.

Rail Washout Rectification – Newman (BHP) – $5.1M
Installed culverts under live rail. Stabilised track and resolved unexpected ground conditions.

TWA Village Construction – Karratha (Bechtel) – $9.5M
Full site development: bulk earthworks, drainage, culverts, roundabout, in-ground services. Adjusted to complex stormwater design and subsoil conditions.

Additional Capabilities

Borrow Pit Establishment

Material Haulage

Drainage & Culverts

Pad & Roadway Construction

Asphalting & Resurfacing

In-Ground Services

Rehabilitation & Erosion Rectification

Heritage Works (Eastern Pilbara)

Haul Road Grading

Concrete Bund Construction

Water Supply Infrastructure (WWTPs, Standpipes)