KW Civil was engaged to construct high-strength reinforced concrete foundations for a new tank system, including all associated excavation, soil stabilisation, and concrete pours.
Ground conditions required remediation through chemical and mechanical stabilisation methods to increase density and load-bearing strength. Material supply risks were also mitigated through proactive procurement strategies and reliable supply partnerships.
The project was delivered on time and within budget, with the completed tank platform meeting all engineering and design requirements. The final installation was leak-free, fully functional, and structurally sound, supporting long-term reliability and operational performance.